Tensions are rising in Kericho County as residents took to the streets on Saturday, July 11, 2026, to protest the alleged alteration of the Standard Gauge Railway (SGR) route. Protesters claim the sudden changes will bypass the county’s proposed railway terminal, robbing the local economy of the massive benefits expected from the multibillion-shilling project.
According to the residents, the original route surveyed in 2022 has been changed behind closed doors, without public participation or consultation with the affected communities.
Key Grievances Raised by Protesters
The demonstrations highlight a growing sense of betrayal among locals who had already prepared for the railway’s arrival:
-
Bypassing the Chebilat Terminal: Residents argue the revised alignment bypasses the proposed Chebilat terminal, a facility they expected would attract logistics firms, create jobs, and improve transport links.
-
Halted Land Compensation: Many landowners had already completed land succession and surrendered their properties, only to be left in limbo with pending compensation as rumors of the route change surfaced.
-
Downgraded Stations: The protests follow similar outrage in Chebinyiny (Cheplanget Ward), where residents recently discovered that the proposed Sotik North SGR station had been downgraded to a mere “passing point” rather than a full passenger terminal.
Economic Stakes for the South Rift
Historically, railway stations serve as massive economic catalysts, driving the growth of warehouses, markets, hospitality, and housing. Kericho residents fear that diverting the line will isolate the region and deny them a vital transport hub.
If constructed as originally planned, the Chebilat terminal is expected to:
-
Slash Transport Costs: Significantly lower transit expenses for key local agricultural exports, including tea, milk, and horticultural products.
-
Unlock Regional Trade: Serve as a pivotal connection point for both Kericho and neighboring counties.
-
Drive Job Creation: Open up the South Rift to fresh investments, logistics centers, and hospitality businesses.
In Their Own Words
“The SGR was brought here to benefit the residents of Kericho. We welcomed the project, land succession has already been done, and many people are waiting for compensation. Now we are hearing the route has changed, and we will not accept it.” — A Kericho resident during the protests
The angry demonstrators have appealed to the national government to restore the original 2022 route and retain the Chebilat station. Warning of continued protests, they have called on their local Members of Parliament to take a firm stand and reject any attempts to divert the railway line.





